电力勘测设计Issue(6):55-60,6.DOI:10.13500/j.dlkcsj.issn1671-9913.2024.06.012
改进平均间隙法在某电厂沉降观测中的应用研究
Research on Application of Improved Mean Gap Method in Settlement Monitoring for a Thermal Power Plant
王嘉鹏 1杨帅 1库新勃 1张海龙 1李龙威1
作者信息
- 1. 中国电力工程顾问集团西北电力设计院有限公司,陕西 西安 710075
- 折叠
摘要
Abstract
The mean gap method,which is often used to test the stability of reference network,has some defects in finding unstable points,such as complex process,large amount of calculation,and the test object is affected by the adjustment reference.An improved mean gap method combined with density peak clustering is proposed and successfully applied in the settlement monitoring of a thermal power plant.The application results show that the improved mean gap method can correctly detect the unstable points,with lower computational complexity,higher inspection efficiency and reliability.关键词
沉降监测/改进平均间隙法/基准点/稳定性分析/密度峰聚类Key words
settlement monitoring/improved mean gap method/reference point/stability analysis/density peak clustering分类
土木建筑引用本文复制引用
王嘉鹏,杨帅,库新勃,张海龙,李龙威..改进平均间隙法在某电厂沉降观测中的应用研究[J].电力勘测设计,2024,(6):55-60,6.