|国家科技期刊平台
首页|期刊导航|广东水利水电|两河夹堤除险加固工程地质问题分析研究

两河夹堤除险加固工程地质问题分析研究OA

Analysis on Geological Problems in the Reinforcement Engineering of the Two Rivers Embankment:A case study of Dongguan Embankment

中文摘要英文摘要

为了更好的服务除险加固工程的实施,需要提前查明已建堤防加固工程沿线的水文地质、工程地质条件,提出相应处理措施的建议.该文以东莞大堤南城段除险加固工程为例,就堤基地质条件进行了地质分析,根据分析成果提出处理建议,并对处理方法进行典型断面计算,再综合考虑各方面因素,结果表明处理方法经计算亦可达到预期,可供从事水利水电工程勘察工程技术人员参考.

Embankment engineering,as one of the most common and effective flood prevention measures,is widely used in flood disaster areas in China.In order to better serve the implementation of the risk removal and reinforcement project,it is necessary to find out the hydrogeological and engineering geological conditions along the existing embankment reinforcement project in advance,and propose corresponding treatment measures.This article takes the risk removal and reinforcement project of the southern section of the Dongguan embankment as an example to conduct a geological analysis of the geological conditions of the embankment foundation.Based on the analysis results,treatment suggestions are proposed,and typical cross-section calculations are carried out for the treatment method.

王可为

东莞市水利勘测设计院有限公司,广东 东莞 523000

水利科学

东莞大堤除险加固地质分析地层岩性渗漏稳定抗滑稳定沉降变形

Dongguan embankmentrisk removal and reinforcementgeological analysisformation lithologystable leakageanti slip stabilitysettlement deformation

《广东水利水电》 2024 (006)

19-23 / 5

评论