Abstract
Embankment engineering,as one of the most common and effective flood prevention measures,is widely used in flood disaster areas in China.In order to better serve the implementation of the risk removal and reinforcement project,it is necessary to find out the hydrogeological and engineering geological conditions along the existing embankment reinforcement project in advance,and propose corresponding treatment measures.This article takes the risk removal and reinforcement project of the southern section of the Dongguan embankment as an example to conduct a geological analysis of the geological conditions of the embankment foundation.Based on the analysis results,treatment suggestions are proposed,and typical cross-section calculations are carried out for the treatment method.关键词
东莞大堤/除险加固/地质分析/地层岩性/渗漏稳定/抗滑稳定/沉降变形Key words
Dongguan embankment/risk removal and reinforcement/geological analysis/formation lithology/stable leakage/anti slip stability/settlement deformation分类