| 注册
首页|期刊导航|华东交通大学学报|地铁车站狭长基坑支撑异常轴力分析

地铁车站狭长基坑支撑异常轴力分析

刘利国 罗家文 朱碧堂

华东交通大学学报2024,Vol.41Issue(3):20-28,9.
华东交通大学学报2024,Vol.41Issue(3):20-28,9.

地铁车站狭长基坑支撑异常轴力分析

Analysis of Abnormal Strut Axial Forces for Narrow and Long Deep Excavation of Metro Stations

刘利国 1罗家文 2朱碧堂2

作者信息

  • 1. 中铁四局集团有限公司,安徽合肥 230023
  • 2. 华东交通大学土木建筑学院,江西南昌 330013||江西省地下空间技术开发工程研究中心,江西南昌 330013
  • 折叠

摘要

Abstract

[Objective]The purpose of this paper is to address the issue of excessive axial force in the first sup-port of a narrow and long deep excavation of metro stations during construction.[Method]Through the method of finite element analysis using the hardening soil model with small strain stiffness(HSS),the excavation meth-od of the station pit,poor quality of steel support installation,and the untimely stressing of the steel support are simulated in a refined way to analyze the influence on the axial force of the first support.[Result]The results show that the use of basin excavation has a significant effect on the axial force of the first support,which increas-es by 45%compared with the case of layered excavation,and the corresponding position of the steel support should be installed in time;when the prestress of the installed steel support does not reach the design value,it will lead to an increase in the axial force of the top support at the end of the excavation,with an increase of 10%or less,and a decrease in the axial force of the bottom support.[Conclusion]Basin over-excavation should be strictly limited during excavation of narrow and long deep excavation of metro stations;The effect of tempera-ture changes on support axial forces cannot be ignored;when the prestressing force of the installed lower steel support fails to reach the design value,it will lead to a large axial force of the top support at the bottom of excavation.

关键词

狭长型基坑/支撑轴力/土体小应变硬化模型/盆式开挖

Key words

narrow and long deep excavation/strut axial force/hardening soil model with small strain stiffness/basin excavation method

分类

交通工程

引用本文复制引用

刘利国,罗家文,朱碧堂..地铁车站狭长基坑支撑异常轴力分析[J].华东交通大学学报,2024,41(3):20-28,9.

基金项目

国家自然科学基金项目(52208343,52020105003) (52208343,52020105003)

华东交通大学学报

OACSTPCD

1005-0523

访问量0
|
下载量0
段落导航相关论文