基于BIM的大跨度钢坝闸安装施工技术

李有平 朱国林 王永强 余光勇

四川水力发电2024,Vol.43Issue(3):8-10,28,4.
四川水力发电2024,Vol.43Issue(3):8-10,28,4.

基于BIM的大跨度钢坝闸安装施工技术

BIM-based Installation and Construction Technology for Long-span Steel Dam Gates

李有平 1朱国林 1王永强 1余光勇1

作者信息

  • 1. 中国水利水电第十工程局有限公司,四川成都 610036
  • 折叠

摘要

Abstract

Long-span steel dam gates are widely used as landscape water retaining structures in urban river eco-logical management projects.The on-site installation of gates requires a large amount of work and high instal-lation accuracy.The paper takes two long-span steel dam gates,85 meters in the East River and 49 meters in the West River,as the objects of the first phase of the"Three Rivers and Six Banks"ecological governance pro-ject in Xichang City.By applying BIM technology,the three-dimensional model of the steel dam gates are es-tablished,and the installation process of the steel dam gates are optimized to effectively improve the qualifica-tion rate of the gate installation,which provides good reference for the installation of similar long-span steel dam gates.

关键词

大跨度钢坝闸/BIM/安装/施工技术/西昌市"三河六岸"

Key words

Long-span steel dam gates/BIM/Installation/Construction technology/"Three Rivers and Six Banks"in Xichang City