四川水力发电2024,Vol.43Issue(3):22-24,36,4.
高流速大粒径漂卵石复杂条件下非通航河道疏浚施工技术研究
Research on Dredging Construction Technology of Non-navigable River under Complex Conditions such as High Velocity and Large Particle Size Boulders and Pebbles
巫德武1
作者信息
- 1. 中国水利水电第十工程局有限公司,四川 成都 610036
- 折叠
摘要
Abstract
In hydropower development projects,good economic benefits can be achieved by the expansion of downstream river channels of hydropower stations to increase water head and increase installed capacity.How-ever,due to complex site conditions such as hydrometeorology and geological strata of river channels,some downstream river channels of hydropower stations do not have the conditions for expansion and excavation.This paper introduces the research on the dredging construction technology of non-navigable river under com-plex conditions such as high velocity and large particle size boulders and pebbles of the downstream river treatment project of Shaping I Hydropower Station in Dadu River,and puts forward the ideas and methods to solve the technical problems of river dredging under complex conditions,so as to provide reference for similar projects.关键词
沙坪一级水电站/大粒径漂卵石/复杂条件/非通航河道/疏浚/施工技术Key words
Shaping I Hydropower Station/Large particle size boulders and pebbles/Complex conditions/Non-navigable river channel/Dredging/Construction technology分类
建筑与水利引用本文复制引用