四川水力发电2024,Vol.43Issue(3):88-92,5.
高海拔地区高面板堆石坝智能建设关键技术及应用
Key Technologies and Applications for Intelligent Construction of High Concrete Face Rock-fill Dams in High-Altitude Areas
张毅 1侯树芃 1李亮1
作者信息
- 1. 华电金沙江上游水电开发有限公司巴塘分公司,四川巴塘 610000
- 折叠
摘要
Abstract
The construction scale of high concrete face rockfill dams in high-altitude areas is large and the con-struction environment is harsh.Currently,smart engineering can provide an important foundation for the con-struction and management of high concrete face rockfill dams.However,the construction of concrete face rock-fill dams in high-altitude areas still faces numerous challenges,making it difficult to ensure that the engineering construction is fully controlled.In response to this issue,this project,based on the concept of smart engineer-ing and focuses on the high concrete face rockfill dam of the Lawa Hydropower Station as the main research object,constructed a key technology system for intelligent construction of high face rockfill dams in high-alti-tude areas.By establishing a full coverage communication network in the construction site area and monitoring the entire process of slope and cofferdam safety,dam filling and foundation treatment quality,the safety and quality of engineering construction have been effectively ensured,and the level of construction process control has been improved.关键词
高海拔/高面板堆石坝/安全管控/坝体填筑Key words
High-altitude areas/High concrete face rock-fill dams/Safety management/Dam filling分类
建筑与水利引用本文复制引用
张毅,侯树芃,李亮..高海拔地区高面板堆石坝智能建设关键技术及应用[J].四川水力发电,2024,43(3):88-92,5.