| 注册
首页|期刊导航|四川水力发电|浅谈高海拔双闸室薄壁竖井开挖支护施工技术

浅谈高海拔双闸室薄壁竖井开挖支护施工技术

钱凯旋 朱四辈 李凯 史明泽

四川水力发电2024,Vol.43Issue(3):106-110,5.
四川水力发电2024,Vol.43Issue(3):106-110,5.

浅谈高海拔双闸室薄壁竖井开挖支护施工技术

Discussion on the High-altitude Double Gate Thin-walled Shaft Excavation and Support Construction Technology

钱凯旋 1朱四辈 2李凯 2史明泽2

作者信息

  • 1. 华电金沙江上游水电开发有限公司拉哇分公司,四川巴塘 627650
  • 2. 中国水利水电第四工程局有限公司西南分局拉哇水电站工程项目部,四川巴塘 627650
  • 折叠

摘要

Abstract

In order to solve the difficulties of the double shaft of Lawa Hydropower Station,such as small oper-ating space,large vertical height,large excavation size,small thickness of rock mass between the shafts,high al-titude,complex environment and high safety factor requirements,the blasting design was optimized by adopting the method of integrating reasonable mechanization technology and optimized traditional technology in the con-struction process,and the construction technology of ultra-deep shaft excavation and support was formed and summarized,which ensured the fast,safe,high-quality and efficient construction of the thin-walled shaft of the double gate chamber in the high-altitude area.The experience can provide an important reference for similar shaft excavation and support projects in many fields such as pumped storage power stations,tunnel transporta-tion,mine construction,and has a wide range of utilization value and application prospects.

关键词

高海拔/双闸室/薄壁竖井/开挖支护/施工技术

Key words

High altitude/Double gate/Thin-walled shaft/Excavation and support/Construction technology

分类

交通工程

引用本文复制引用

钱凯旋,朱四辈,李凯,史明泽..浅谈高海拔双闸室薄壁竖井开挖支护施工技术[J].四川水力发电,2024,43(3):106-110,5.

四川水力发电

1001-2184

访问量3
|
下载量0
段落导航相关论文