大型水电站高边坡塌方治理施工技术

曾鸣 陈巍 古小梦

四川水力发电2024,Vol.43Issue(3):111-115,5.
四川水力发电2024,Vol.43Issue(3):111-115,5.

大型水电站高边坡塌方治理施工技术

Construction Technology for High Slope Collapse Control of Large Hydropower Stations

曾鸣 1陈巍 1古小梦2

作者信息

  • 1. 中国水利水电第五工程局有限公司,四川成都 610016
  • 2. 华电金沙江上游水电开发有限公司,四川成都 610041
  • 折叠

摘要

Abstract

On May 12,2020,the F46/F21 fault at the exit of a flood discharge tunnel of a hydropower station caused slope collapse.The collapse height was about 40 m,and the collapse volume was about 11000 m3,which seriously restricted the realization of diversion target by the end of December 2020.All the parties in-volved in the construction have formulated the treatment plan of the collapse slope,adopted the combined treat-ment measures such as backpressure stone slag,sprayed steel fiber concrete,I-beam scaffolding and corbel col-umn composite support structure,steel anchor pier temporary support,pipe shed and so on,and completed the slope treatment quickly and safely under extremely difficult conditions,and realized the target of diversion of Batang Hydropower Station by the end of December 2020.

关键词

反压石渣/钢棚架/钢锚墩/管棚

Key words

Backpressure stone slag/Steel shed frame/Steel anchor pier/Pipe shed

分类

土木建筑

引用本文复制引用

曾鸣,陈巍,古小梦..大型水电站高边坡塌方治理施工技术[J].四川水力发电,2024,43(3):111-115,5.

四川水力发电

1001-2184

访问量0
|
下载量0
段落导航相关论文