Construction Technology for Mirror Concrete Lining of Flood Discharge and Spillway Tunnel of Lawa Hydropower Station

余建国 1衣志勇 1杨红富1

作者信息

  • 1. 四川二滩国际工程咨询有限责任公司,四川 成都 611130
  • 折叠

摘要

Abstract

In this paper,the wall lining around the flood discharge and spillway tunnel of Lawa Hydropower Sta-tion was taken as the research object.Through technological tests,the influence of different formwork materi-als,different vibration parameters and different release agents were compared on the appearance quality of mir-rored concrete.The results show that:The appearance quality of mirror concrete can be effectively improved by using single-sided polished steel plate or composite steel plate as template,using salad oil as release agent,and using vibration parameters of 60 s for initial vibration,45 s for re-vibration,and 20 min interval.Optimi-zing vibration process and strengthening quality control during construction play a key role in the appearance quality of mirror concrete.

关键词

镜面混凝土/振捣参数/模板材质

Key words

Mirror concrete/Vibration parameter/Template material