浅析选矿厂新建尾矿库建库技术条件

李彤

世界有色金属Issue(7):199-201,3.
世界有色金属Issue(7):199-201,3.

浅析选矿厂新建尾矿库建库技术条件

Analysis of Technical Conditions for Building Tailings Ponds in Mineral Processing Plants

李彤1

作者信息

  • 1. 甘肃省有色金属地质勘查局张掖矿产勘查院,甘肃 张掖 734000
  • 折叠

摘要

Abstract

Through the study of the construction conditions of the new tailings pond in the beneficiation plant,it was found that the hydrogeological characteristics of the new tailings pond are mainly manifested in the terrain and topography of the area,as well as surface water,hydro meteorology,and groundwater;Based on the local environment and resource storage,analyze the construction conditions of the tailings pond,and elaborate on five aspects:the impact of engineering geological conditions at the site on the exploration technical conditions,the hydraulic connection between groundwater and aquifers,the determination of site soil types and foundation soil types,wind erosion factors of the tailings pond,flood control safety,and environmental protection measures.

关键词

新建尾矿库/水文地质特征/建库条件/场地土类别/防洪安全/防污

Key words

New tailings pond construction/Hydrogeological characteristics/Construction conditions/Site soil category/Flood control safety/antifouling

分类

管理科学

引用本文复制引用

李彤..浅析选矿厂新建尾矿库建库技术条件[J].世界有色金属,2024,(7):199-201,3.

世界有色金属

1002-5065

访问量0
|
下载量0
段落导航相关论文