双基站空间定位与测量系统在主管道安装中的应用OA北大核心CSTPCD
Application of dual base station spatial positioning and measurement system in installation of main pipelines
针对百分表、直尺测距等传统主管道焊接变形量及趋势的监测方法对人员技能水平要求高、数据计算量大、存在反馈不及时等问题,开展了双基站空间定位与测量系统在主管道安装过程中动态监测应用研究.基于非接触、面阵式测量特点,能够通过多相机实现视场角范围内多个测量点一次测量,瞬时获取大量数据,具有测量效率高的技术优势.通过各主设备端管口及主管道模拟定位、测量系统现场布设及标定、监测基准选择、组对焊接过程监测等工艺流程的实施,实现了该系统在某核电项目主管道焊接全过…查看全部>>
In response to the issues of traditional monitoring methods for welding deformation and trends of main pipelines,such as dial gauges and rulers,which require high levels of personnel skills,involve large amount of data calculation,and have delays in feedback,the research has primarily focused on the application of dual-base station spatial positioning and measurement systems for dynamic monitoring during the installation process of main pipelines.Based on no…查看全部>>
路宏杰;张萌;许志强;仲维光;张亚军;赫海涛
中国核工业二三建设有限公司,北京 100000||深圳普达核工业数字测控有限公司,广东深圳 518120普达迪泰(天津)智能装备科技有限公司,天津 300000中国核工业二三建设有限公司,北京 100000||深圳普达核工业数字测控有限公司,广东深圳 518120中国核工业二三建设有限公司,北京 100000中国核工业二三建设有限公司,北京 100000中国核工业二三建设有限公司,北京 100000||深圳普达核工业数字测控有限公司,广东深圳 518120
机械工程
主管道空间定位测量系统过程控制位移监测
main pipelinespatial positioning and measurement systemprocess controldisplacement monitoring
《压力容器》 2024 (4)
80-86,7
中核集团全产业链"卡脖子"攻关项目(CNI23-W-KY-2022-13)