梨园水电站发电机新型碳刷刷握底座的设计与实践

颜强 张大宏 李建魁

云南水力发电2024,Vol.40Issue(6):35-37,3.
云南水力发电2024,Vol.40Issue(6):35-37,3.DOI:10.3969/j.issn.1006-3951.2024.06.014

梨园水电站发电机新型碳刷刷握底座的设计与实践

Design and Practice of a New Carbon Brush Holder Base for the Generator of Liyuan Hydropower Station

颜强 1张大宏 1李建魁1

作者信息

  • 1. 云南华电金沙江中游水电开发有限公司梨园发电分公司,云南 丽江 674100
  • 折叠

摘要

Abstract

During the maintenance process of the generator set,the carbon brush holder of the generator in the slip ring room needs to be removed and replaced,and a series of maintenance work should be carried out on the slip ring,guide ring,positive and negative pole joints,etc.After each component is repaired,it should be reinstalled.When reinstalling the carbon brush holder,the distance between the brush holder and the sliding ring needs to be adjusted after the brush holder is inserted into the base,with a requirement of 2-3 mm,to prevent problems such as sliding ring ignition and high carbon brush temperature caused by excessively long or short distance.To solve this problem,a new type of carbon brush holder base for generators has been designed.

关键词

水轮发电机组/碳刷底座/间隙调整

Key words

water turbine generator set/carbon brush base/gap adjustment