云南水力发电2024,Vol.40Issue(6):41-44,4.DOI:10.3969/j.issn.1006-3951.2024.06.016
一种万向节阀门电动操作工具在水力发电中的可行性研究
Feasibility Study on a Universal Joint Valve Electric Operating Tool in Hydropower Generation
张俊杰 1耿晓育 1蓝道伟1
作者信息
- 1. 云南华电金沙江中游水电站开发有限公司梨园发电分公司,云南 丽江 674100
- 折叠
摘要
Abstract
During the maintenance period of hydropower stations,the interaction between equipment operation and maintenance status involves the operation of fully closing or fully opening valves.Among them,there may be problems such as too many valve coils,jamming,and multiple people rotating to switch a single valve,resulting in long working hours,low efficiency,and high labor costs.Taking inspiration from universal joints and electric wrenches,this paper develops an auxiliary operating tool,studies and analyzes the problem of valve switching,develops a plan,and studies its feasibility.关键词
电动操作工具/阀门操作/提升效率/可行性Key words
electric operating tool/valve operation/improve efficiency/feasibility分类
建筑与水利引用本文复制引用
张俊杰,耿晓育,蓝道伟..一种万向节阀门电动操作工具在水力发电中的可行性研究[J].云南水力发电,2024,40(6):41-44,4.