| 注册
首页|期刊导航|云南水力发电|一种万向节阀门电动操作工具在水力发电中的可行性研究

一种万向节阀门电动操作工具在水力发电中的可行性研究

张俊杰 耿晓育 蓝道伟

云南水力发电2024,Vol.40Issue(6):41-44,4.
云南水力发电2024,Vol.40Issue(6):41-44,4.DOI:10.3969/j.issn.1006-3951.2024.06.016

一种万向节阀门电动操作工具在水力发电中的可行性研究

Feasibility Study on a Universal Joint Valve Electric Operating Tool in Hydropower Generation

张俊杰 1耿晓育 1蓝道伟1

作者信息

  • 1. 云南华电金沙江中游水电站开发有限公司梨园发电分公司,云南 丽江 674100
  • 折叠

摘要

Abstract

During the maintenance period of hydropower stations,the interaction between equipment operation and maintenance status involves the operation of fully closing or fully opening valves.Among them,there may be problems such as too many valve coils,jamming,and multiple people rotating to switch a single valve,resulting in long working hours,low efficiency,and high labor costs.Taking inspiration from universal joints and electric wrenches,this paper develops an auxiliary operating tool,studies and analyzes the problem of valve switching,develops a plan,and studies its feasibility.

关键词

电动操作工具/阀门操作/提升效率/可行性

Key words

electric operating tool/valve operation/improve efficiency/feasibility

分类

建筑与水利

引用本文复制引用

张俊杰,耿晓育,蓝道伟..一种万向节阀门电动操作工具在水力发电中的可行性研究[J].云南水力发电,2024,40(6):41-44,4.

云南水力发电

1006-3951

访问量0
|
下载量0
段落导航相关论文