云南水力发电2024,Vol.40Issue(6):55-57,3.DOI:10.3969/j.issn.1006-3951.2024.06.020
绿水河电厂二级站2号机组振动超标的处理方法
Treatment Method of Excessive Vibration of Unit 2 in Lvshuihe Power Plant Secondary Station
李辉 1唐鑫 1刘继永1
作者信息
- 1. 华电云南发电有限公司绿水河发电厂,云南 个旧 661014
- 折叠
摘要
Abstract
The stable operation of the whole generator unit mainly depends on the stable operation of the turbine.When the rotating parts are unbalanced due to design and other factors,the generator set will produce certain vibration.When the vibration exceeds a certain range,it will bring great potential safety hazards to safety production.Therefore,it is necessary to carefully study the causes of unit vibration and take effective solutions in time.This paper analyzes the causes of excessive vibration of No.2 unit in Yunnan Huadian Lvshuihe power plant secondary station,and studies the treatment methods of excessive vibration combined with the actual situation.关键词
水电厂/水轮发电机组/振动超标Key words
hydropower plant/waterturbine generator set/excessive vibration分类
信息技术与安全科学引用本文复制引用
李辉,唐鑫,刘继永..绿水河电厂二级站2号机组振动超标的处理方法[J].云南水力发电,2024,40(6):55-57,3.