云南水力发电2024,Vol.40Issue(6):65-67,3.DOI:10.3969/j.issn.1006-3951.2024.06.023
某电站35 kV隔离式熔断器故障导致跳闸的分析与处理
Analysis and Handling of Tripping Caused by 35 kV Isolation Fuse Failure in a Power Station
赵志巅 1杨怀明1
作者信息
- 1. 华电云南发电有限公司绿水河发电厂,云南 个旧 661014
- 折叠
摘要
Abstract
With the proposal of carbon neutrality and carbon peak goals,China's new energy has entered a fast lane of rapid development.Photovoltaic power stations have also developed accordingly.Yunnan is mostly mountainous in geographical conditions,resulting in scattered photovoltaic areas.The transmission of electricity from the photovoltaic area to the booster station inevitably requires a combination of buried and overhead lines.This also directly led to various faults in the isolation fuse of the upper tower during operation,resulting in the inability to transmit electrical energy normally.This paper analyzes and summarizes the common faults of 35 kV collector line isolation fuse in a photovoltaic power station during operation,and proposes corresponding solutions.关键词
架空线路/隔离式熔断器故障/故障分析Key words
aerial line/isolation fuse failure/fault analysis分类
信息技术与安全科学引用本文复制引用
赵志巅,杨怀明..某电站35 kV隔离式熔断器故障导致跳闸的分析与处理[J].云南水力发电,2024,40(6):65-67,3.