云南水力发电2024,Vol.40Issue(6):83-88,6.DOI:10.3969/j.issn.1006-3951.2024.06.029
金沙江中游梯级水电站发电预腾库调度策略研究
Research on Pre-emptying Scheduling Strategy for Power Generation of Cascade Hydropower Stations in the Middle Reaches of Jinsha River
蒲文辉 1王瑞兵1
作者信息
- 1. 云南华电金沙江中游水电开发有限公司,云南 昆明 650228
- 折叠
摘要
Abstract
In order to achieve maximum power generation during the flood season,this article analyzes the flood characteristics of the middle reaches of the Jinsha River basin and conducts research on pre emptying reservoir scheduling strategies for power generation.The results show that the main flood season in the middle reaches of Jinsha River basin generally follows a multi peak inflow process,and there may be situations where the inflow during local periods drops below the full discharge of Jinzhong cascade power stations.Based on the characteristics of floods,the flood season is mainly divided into three stages:early flood,mid flood,and late flood,and corresponding pre-emptying reservoir scheduling strategies are proposed to provide reference for scheduling operations when the water recedes to below the full flow rate during certain periods of the flood season.关键词
金沙江中游/水电站/水库调度/发电预腾库Key words
the middle reaches of Jinsha River/hydropower station/reservoir scheduling/power generation pre-emptying分类
建筑与水利引用本文复制引用
蒲文辉,王瑞兵..金沙江中游梯级水电站发电预腾库调度策略研究[J].云南水力发电,2024,40(6):83-88,6.