| 注册
首页|期刊导航|铁道科学与工程学报|双边供电下的钢轨电位影响因素及抑制措施分析

双边供电下的钢轨电位影响因素及抑制措施分析

王克文 李卫兰 王辉

铁道科学与工程学报2024,Vol.21Issue(6):2465-2475,11.
铁道科学与工程学报2024,Vol.21Issue(6):2465-2475,11.DOI:10.19713/j.cnki.43-1423/u.T20231408

双边供电下的钢轨电位影响因素及抑制措施分析

Influencing factors and suppression measures of rail potentials under the bilateral power supply

王克文 1李卫兰 2王辉3

作者信息

  • 1. 北京交通大学 电气工程学院,北京 100044||国家能源集团 新朔铁路有限责任公司,内蒙古 鄂尔多斯 017099
  • 2. 西南交通大学 电气工程学院,四川 成都 611756
  • 3. 西南交通大学 电气工程学院,四川 成都 611756||成都尚华电气有限公司,四川 成都 610200
  • 折叠

摘要

Abstract

The bilateral power supply method can realize the long-distance and non-phase separated through power supply,as compared to the unilateral power supply method.The traction return current characteristics of the system are different,which could lead to different rail potential distribution;therefore,it is necessary to study the rail potential of the bilateral power supply method.Based on the model of bilateral power supply multiplex traction network,the calculation method of system rail potential and current in rail was derived,and the suppression measures of rail potential in bilateral power supply multiplex traction network were proposed by analyzing the influencing factors of rail potential.The results of the study show that the rail potentials near the current pickup point of the unilateral power supply and the bilateral power supply are basically the same,but the bilateral power supply method will cause lower rail potentials at the traction substation.Under the bilateral power supply mode,the rail potential reaches the maximum value at the locomotive picking up current.The rail potential on both sides of the picking up current point decreases gradually,and the rail potential distribution is almost the same when locomotives on the up line and down line are symmetrically located about the midpoint of the zone of neighboring substations.The closer the locomotive is to the midpoint of the zone of neighboring substations,the larger the rail potential is.The train operation organization should try to avoid the locomotive meeting close to the mid-point of two traction substations.The maximum value of rail potential is from 52.49 V to 109.01 V when rail-ground transition resistance increases from 3 Ω∙km to 15 Ω∙km,with an increase of 107.68%,and the effect of rail potential inhibition can be achieved through the reduction of resistance.When the soil resistivity increases from 10 Ω∙km to 200 Ω∙km,the rail potential at the traction substation increased from 10.82 V to 36.74 V,an increase of 239.56%,and the analysis and management of the rail potential need to take the soil conditions into full consideration.After the installation of additional through ground line,the rail potential at the locomotive taking the flow is rapidly reduced,which is an obvious effect of the installation of additional through ground line in suppressing the rail potential.

关键词

双边供电/复线牵引网,钢轨电位/影响因素/抑制措施

Key words

bilateral power supply/multiple traction network/rail potential/influencing factors/suppression measures

分类

交通工程

引用本文复制引用

王克文,李卫兰,王辉..双边供电下的钢轨电位影响因素及抑制措施分析[J].铁道科学与工程学报,2024,21(6):2465-2475,11.

基金项目

2021国家能源投资集团有限责任公司重大科技项目(F1GD20200002) (F1GD20200002)

铁道科学与工程学报

OA北大核心CSTPCDEI

1672-7029

访问量0
|
下载量0
段落导航相关论文