| 注册
首页|期刊导航|电力需求侧管理|基于㶲分析的温控负荷潜力评估与竞价策略研究

基于㶲分析的温控负荷潜力评估与竞价策略研究

孟诗语 史文博 邹风华 曹骏 陈爱康 王淞

电力需求侧管理2024,Vol.26Issue(4):55-60,6.
电力需求侧管理2024,Vol.26Issue(4):55-60,6.DOI:10.3969/j.issn.1009-1831.2024.04.009

基于㶲分析的温控负荷潜力评估与竞价策略研究

Research on the assessment of temperature control loads potential and bidding strategy based on human exergy analysis

孟诗语 1史文博 1邹风华 1曹骏 2陈爱康 1王淞3

作者信息

  • 1. 国网(苏州)城市能源研究院有限责任公司,江苏 苏州 215163
  • 2. 国网江苏省电力有限公司 苏州供电分公司,江苏 苏州 215200
  • 3. 东南大学,南京 210096
  • 折叠

摘要

Abstract

The potential analysis and aggregate control of temperature control loads are generally required,but the existing scheduling mode of direct control of temperature control load affects the user's privacy.exergy analysis based on exergy power plant peak load poten-tial assessment and regulation strategy is proposed.Firstly,exergy analysis shows that exergy comfort temperature range of human body can be accurately evaluated to determine the peak load capacity range of residential TCLs,and then determine the response capability of residential TCLs.Then,virtual power plant is considered as the main body for regulating multiple TCLs.Based on the utility function of the TCLs user,the price-power bidding curve is obtained,and the response adjustment capability information is submitted.Finally,after receiving the bidding curves of multiple users,VPP takes the revenue maximization as the optimization goal and the purchase price as the decision variable to obtain the optimal scheduling strategy of VPP.Exergy simulation results verify the effectiveness of exergy peak-load potential assessment and regulation strategy for a virtual power plant based on exergy analysis.

关键词

㶲分析/温控负荷/竞价曲线/效用函数/虚拟电厂

Key words

exergy analysis/temperature control load/bidding curve/utility function/virtual power plant

分类

信息技术与安全科学

引用本文复制引用

孟诗语,史文博,邹风华,曹骏,陈爱康,王淞..基于㶲分析的温控负荷潜力评估与竞价策略研究[J].电力需求侧管理,2024,26(4):55-60,6.

基金项目

国网(苏州)城市能源研究院有限责任公司项目(CEKY23066) (苏州)