Lithium battery industrial park can make full use of the advantages of resources to achieve scale production of lithium battery,but the energy consumption intensity is large,and brings energy and link problems,so it is necessary to optimize the production process and achieve low-carbon development.At present,there are many researches on the process optimization of lithium battery manufacturing process,but there are less researches on the analysis and optimization of system performance at the campus level.The purpose is to study the characteristics of energy production and consumption in lithium battery industrial park,and put forward the optimization and improve-ment scheme of the system.Firstly,the steady-state model of typical equipment and links in the lithium battery industrial park is estab-lished.Then,the exergic analysis and thermal economic analysis model of exergic analysis and thermal economic analysis of industrial park based on Sobol method are built.Finally,the feasibility and effectiveness of the proposed method are verified by an example analysis.The calculation results show that hot blast furnace has the lowest exergic efficiency and the highest total exergic cost in the park,and has the highest impact on the exergic cost of system products,so it is necessary to focus on improving its performance.

关键词

工业园区/㶲分析/热经济分析/Sobol灵敏度分析

Key words

industrial park/exergic analysis/thermal economic analysis/Sobol sensitivity analysis

分类

信息技术与安全科学

引用本文复制引用

赵杨阳,翟德曼,张利,艾邓鑫,周咏..基于Sobol法的锂电池工业园区㶲分析及热经济分析研究[J].电力需求侧管理,2024,26(4):81-87,7.

基金项目

国家电网有限公司总部科技项目(1400-202312333A-1-1-ZN) (1400-202312333A-1-1-ZN)

电力需求侧管理

OACSTPCD

1009-1831

访问量0
|
下载量0
段落导航相关论文