| 注册
首页|期刊导航|港口航道与近海工程|地下连续墙槽壁"缩颈"与地下水位关系研究

地下连续墙槽壁"缩颈"与地下水位关系研究

王文欢 刘风波 郭东

港口航道与近海工程2024,Vol.61Issue(3):61-65,5.
港口航道与近海工程2024,Vol.61Issue(3):61-65,5.DOI:10.16403/j.cnki.ggjs20240313

地下连续墙槽壁"缩颈"与地下水位关系研究

Study on Relationship between Slot Wall Necking of Concrete Diaphragm Wall and Groundwater Level

王文欢 1刘风波 1郭东1

作者信息

  • 1. 天津深基工程有限公司,天津 300222
  • 折叠

摘要

Abstract

Based on the study on groundwater level and seepage path of concrete diaphragm wall,an analysis is carried out for the influence of such factors as groundwater level and seepage path of silty fine sand,muddy silty clay and sand layers in coastal area on the formation and mud concentration of concrete diaphragm wall,especially the slot wall necking after the formation of concrete diaphragm wall in coastal area.Dewatering wells and other dewatering/drainage measures are adopted to prevent rising and falling tides from groundwater level,which ensures mud concentration during construction process.In addition,the application of ultrasonic perpendicularity detection is an effective solution to the problem of slot necking during and after the formation of concrete diaphragm wall,which has important guiding significance for similar projects in the future.

关键词

地下连续墙/槽壁缩颈/地下水位/降水井

Key words

concrete diaphragm wall/slot wall necking/groundwater level/dewatering well

分类

建筑与水利

引用本文复制引用

王文欢,刘风波,郭东..地下连续墙槽壁"缩颈"与地下水位关系研究[J].港口航道与近海工程,2024,61(3):61-65,5.

港口航道与近海工程

1004-9592

访问量0
|
下载量0
段落导航相关论文