| 注册
首页|期刊导航|河南水利与南水北调|横排头枢纽消力池方案及施工质量控制措施

横排头枢纽消力池方案及施工质量控制措施

张玉田

河南水利与南水北调2024,Vol.53Issue(6):95-96,2.
河南水利与南水北调2024,Vol.53Issue(6):95-96,2.

横排头枢纽消力池方案及施工质量控制措施

Plan and Construction Quality Control Measures for Hengpaitou Hub Stilling Basin

张玉田1

作者信息

  • 1. 安徽省淠史杭灌区管理总局,安徽 六安 237000
  • 折叠

摘要

Abstract

In order to improve the safety of the Hengpaitou hub,the stilling basin was reinforced and removed from danger.Based on the actual situation of the project,the plan of continuing to build a second level stilling basin downstream of the overflow dam was selected.Due to the presence of arc and slope sections in the stilling basin,problems such as expansion of the arc section and bubbles in the concrete of the slope section occur during the construction process,which are difficulties in construction control.Based on the construction situation and the existing construction quality difficulties,corresponding solutions are proposed to ensure construction quality,which can provide reference for similar projects.

关键词

消力池/施工/混凝土/气泡

Key words

stilling pool/construction/concrete/bubble

分类

建筑与水利

引用本文复制引用

张玉田..横排头枢纽消力池方案及施工质量控制措施[J].河南水利与南水北调,2024,53(6):95-96,2.

河南水利与南水北调

1673-8853

访问量0
|
下载量0
段落导航相关论文