| 注册
首页|期刊导航|河南水利与南水北调|卡河水库工程渗漏处理帷幕灌浆方案比选

卡河水库工程渗漏处理帷幕灌浆方案比选

袁杰

河南水利与南水北调2024,Vol.53Issue(6):45-46,2.
河南水利与南水北调2024,Vol.53Issue(6):45-46,2.

卡河水库工程渗漏处理帷幕灌浆方案比选

The Comparison and Selection of Curtain Grouting Scheme for Leakage Treatment in the Kahe Reservoir Project

袁杰1

作者信息

  • 1. 贵州省六盘水市盘州市鸡场坪镇农村工作服务中心,贵州 盘州市 553525
  • 折叠

摘要

Abstract

Due to the long-term water storage,the deep karst on the left bank of Kahe Reservoir has suffered from penetrated and breakdown,resulting in abnormal storage.Therefore,it is imperative to address the leakage issue of the reservoir.The comparative selection of grouting scheme for the curtain of leakage treatment in the Kahe Reservoir Project is conducted.After gaining a comprehensive understanding of the project's overall situation,the determination of the anti-seepage curtain scope is primarily based on considerations such as the range,principle,and route selection for anti-seepage measures.And then,the tunnel grouting scheme and the surface grouting scheme are then formulated,followed by a comparative analysis of the two schemes.The optimal surface grouting scheme is determined for the design of curtain grouting scheme for leakage treatment of Kahe Reservoir Project.It can also provide a reference for similar engineering practice.

关键词

水库工程/渗漏处理/帷幕灌浆方案/比选

Key words

reservoir engineering/leakage treatment/curtain grouting scheme/comparison and selection

分类

建筑与水利

引用本文复制引用

袁杰..卡河水库工程渗漏处理帷幕灌浆方案比选[J].河南水利与南水北调,2024,53(6):45-46,2.

河南水利与南水北调

1673-8853

访问量0
|
下载量0
段落导航相关论文