河南水利与南水北调2024,Vol.53Issue(6):53-54,2.
某小型水库除险加固工程设计
Design of Small Reservoir Reinforcement Engineering
唐飞 1候晓翠 1郭晓冬 2陈娟3
作者信息
- 1. 新乡市中原水利设计研究院,河南 新乡 453000
- 2. 河南省豫东水利保障中心,河南 开封 475000
- 3. 郑州市生态供水保障中心,河南 郑州 450000
- 折叠
摘要
Abstract
At present,many small reservoirs have many problems due to their long operating years or poor construction quality.The reinforcement engineering should be familiar with the project overview,analyze and evaluate existing problems,make response strategies;According to the basic data,the engineering design is carried out,and the safety and stability analysis of the dam body is emphasized,and the design scheme is finally determined.This paper takes the slurry masonry gravity dam of Huixian Weihe Reservoir as an example,which can provide reference for similar dam reinforcement projects.关键词
水库/除险加固/工程设计Key words
reservoir/reinforcement/design分类
建筑与水利引用本文复制引用
唐飞,候晓翠,郭晓冬,陈娟..某小型水库除险加固工程设计[J].河南水利与南水北调,2024,53(6):53-54,2.