In view of the problems existing in the operation of Yemao Hydropower Station under the original scheduling mode,such as the difficulty of impoundment in non-flood season,the low efficiency of power generation,the extensive scheduling rules,and the possibility of flood passing through the top of the gate,the authors study the timing and judging flow of the power station to reduce the water level from the normal storage level from three aspects:the power generation efficiency of different flow rates,the measured flood rise rate and the flood volume in the period,analyzes the risk of impoundment in the recession section of different peak floods,and put forward the optimized scheduling operation mode.The optimal scheduling method can not only avoid the operation risk of the power station,but also increase the power generation benefit.

关键词

优化调度/调度方式/调度运行/叶茂水电站

Key words

optimal scheduling/scheduling mode/scheduling operation/Yemao Hydropower Station

分类

建筑与水利

引用本文复制引用

蒋正兴,谢海林..叶茂水电站优化调度研究[J].红水河,2024,43(3):25-30,6.

红水河

1001-408X

访问量0
|
下载量0
段落导航相关论文