红水河2024,Vol.43Issue(3):86-93,99,9.DOI:10.3969/j.issn.1001-408X.2024.03.016
抽水蓄能电站库区淹没与库岸稳定分析系统研发及应用
Development and Application of Reservoir Inundation and Bank Stability Analysis System for Pumped Storage Power Station
温焕铃 1林秀子2
作者信息
- 1. 中国能源建设集团广西电力设计研究院有限公司,广西 南宁 530023
- 2. 广西华翼联创科技有限公司,广西 南宁 530009
- 折叠
摘要
Abstract
In order to further accelerate the construction of a new power system and promote the digital transformation of pumped storage power stations.By using geographic information system(GIS)technology and digital elevation model(DEM),this paper establishes the reservoir inundation and bank stability analysis system of pumped storage power station,and analyzes the system module construction and function realization from the aspects of system technical structure,three-dimensional visualization,reservoir inundation analysis,reservoir immersion analysis and reservoir bank slump analysis.The results show that the system can realize the three-dimensional simulation analysis and real-time dynamic demonstration of the boundary line of the reservoir inundation area,reservoir immersion area and bank slump prediction range,and the rapid integration and evaluation of the relevant land use data.The system can provide a scientific decision-making basis for reasonably determining the location of the reservoir dam of the pumped storage power station and formulating plans for land acquisition and demolition,land compensation and resettlement.关键词
库区淹没与库岸稳定分析系统/水库淹没/水库浸没/塌岸/抽水蓄能电站Key words
analysis system for reservoir inundation and bank stability/reservoir inundation/reservoir immersion/bank slump/pumped storage power station分类
建筑与水利引用本文复制引用