山东煤炭科技2024,Vol.42Issue(6):43-47,5.DOI:10.3969/j.issn.1005-2801.2024.06.009
竹林山煤矿大采高工作面回撤通道施工工艺优化与应用
Optimization and Application of Construction Process for the Withdrawal Channel in the Large Mining Height Working Face of Zhulinshan Coal Mine
安宏图 1李志1
作者信息
- 1. 山西阳城阳泰集团竹林山煤业有限公司,山西 晋城 048199
- 折叠
摘要
Abstract
Zhulinshan Coal Mine adopts a"one well,one side"production organization method.In order to effectively avoid the problem of large deformation of the surrounding rock of the channel,the traditional construction process of the withdrawal channel in this mine is to use a roadheader for on-site excavation.This process has the disadvantages of slow construction speed and long construction period,which seriously delays the progress of equipment withdrawal and affects the normal continuation of mining and excavation.In view of this,research is conducted on the optimization of the construction process for the withdrawal channel.Based on a specific analysis of the shortcomings of traditional construction methods,optimization principles are proposed;through targeted technical analysis and reference to currently relatively mature materials and processes,an optimized construction process of"grouting and roof side reinforcement+high-strength flexible mesh+coal mining machine coal cutting"is proposed,and the construction parameters are confirmed.In the application of the withdrawal channel construction in the 1403 working face,the construction period is shortened by 11 days,creating favorable conditions for the safe and rapid withdrawal of equipment in the fully mechanized mining face.关键词
回撤通道/工艺优化/支护参数Key words
withdrawal channel/process optimization/support parameter分类
矿业与冶金引用本文复制引用
安宏图,李志..竹林山煤矿大采高工作面回撤通道施工工艺优化与应用[J].山东煤炭科技,2024,42(6):43-47,5.