大型浮式起重机臂架拉索安装工艺研究

王志利 周刚 钱亮亮

起重运输机械Issue(12):76-81,6.
起重运输机械Issue(12):76-81,6.

大型浮式起重机臂架拉索安装工艺研究

王志利 1周刚 1钱亮亮1

作者信息

  • 1. 上海振华重工(集团)股份有限公司 上海 200125
  • 折叠

摘要

Abstract

ZHENFU No.4 1600t floating crane shall be repaired and maintained according to the instructions.The boom cable needs to be replaced,and there are a series of difficult problems to be solved in the process of replacement,such as lifting,fixing,threading and locking nut installation.By decomposing the installation process of the cable system,researching and demonstrating each process,a detailed process plan was worked out,and finally the installation work was successfully completed.According to this plan,the safety and efficiency of operation can be effectively improved through the cooperation of multiple devices at high altitude,which provides a reference for the installation of boom cable system of similar products.

关键词

大型浮式起重机/臂架拉索系统/安装工序研究

Key words

large floating crane/boom cable system/research on installation process

分类

机械制造

引用本文复制引用

王志利,周刚,钱亮亮..大型浮式起重机臂架拉索安装工艺研究[J].起重运输机械,2024,(12):76-81,6.

起重运输机械

1001-0785

访问量0
|
下载量0
段落导航相关论文