新形势下黄河下游控导工程建设思路探讨
Discussion on Construction of River Training Engineering of the Lower Yellow River Under the New Situation
牛玉国 1李永强 1张金鹏1
作者信息
- 1. 黄河水利委员会,河南 郑州 450003
- 折叠
摘要
Abstract
River training works of the Lower Yellow River were tested by the historically rare autumn flood in 2021.Based on the analysis of engineering design and management,it is believed that changes in water and sediment conditions,reduced design flow rate of control and navigation engineering,river cutting,increased flat flow rate,and large-scale rescue machinery and equipment are the reasons for the prob-lems of the river training works exposed during flood,such as insufficient dam crest height,insufficient root stones,insufficient length of pro-tective sections,and insufficient traffic capacity of rescue roads.Some countermeasures and recommendations were advised to avoid the occur-rence of similar problems.关键词
控导工程/中常洪水/黄河下游Key words
river training works/moderate to normal flood/Lower Yellow River分类
建筑与水利引用本文复制引用
牛玉国,李永强,张金鹏..新形势下黄河下游控导工程建设思路探讨[J].人民黄河,2024,46(7):39-41,78,4.