摘要
Abstract
In the process of offshore oil production,if the quality of the equipment is not up to standard,it will affect the normal operation of the whole production activities,which will lead to a lot of problems and reduce the economic benefits of the enterprise.Therefore,it is necessary to analyze the installation and construction of production facilities and equipment in detail in order to improve the efficiency of offshore oil production.In the process of installing equipment,if the work of each unit is limited to within its own work boundary,it will inevitably affect the construction of other units,and at the same time,it is difficult to get a good operation of the construction of the unit.Therefore,the construction unit,the design unit,the supervision unit and the platform production side should work together to design the overall technical program and construction process,to ensure that the construction of the equipment installation and debugging work to master and monitor the successful completion of the equipment installation of the coordination,which is important for the production capacity of the project as soon as possible to realize the practical significance.On this basis,its equipment installation and construction with the specific measures to explore,in order to put forward the corresponding reference and basis for China's petroleum science and actual construction.关键词
海洋石油/设备安装与施工/电气设备Key words
offshore oil/equipment installation and construction/electrical equipment分类
能源科技