| 注册
首页|期刊导航|铁道货运|铁路口岸站作业系统能力研究

铁路口岸站作业系统能力研究

景菲 李春丽

铁道货运2024,Vol.42Issue(6):60-67,8.
铁道货运2024,Vol.42Issue(6):60-67,8.DOI:10.16669/j.cnki.issn.1004-2024.2024.06.09

铁路口岸站作业系统能力研究

Research on Operation System Capabilities of Railway Port Stations

景菲 1李春丽1

作者信息

  • 1. 内蒙古科技大学 经济与管理学院,内蒙古 包头 014000
  • 折叠

摘要

Abstract

In order to study the operation system capability of railway port stations,a universal model for the operation system of the port stations was established by analyzing the operation characteristics of existing port stations.Queuing theory was introduced into the operation system,and a reverse virtual traffic flow was set up to simulate the operation system as a closed-loop queuing network.Queuing theory tools were used to build a calculation model for the operation system capability.The Alashankou Port Station was studied,and the operation capability of the subsystem was calculated using Matlab.According to the actual operation of the station,the main factors limiting operation capability were identified.The results show that the number of equipment is the main factor limiting the operation system capability,followed by the clearance time,professional quality of operators,connection of the operation,and other factors.Targeted measures can formulated according to the operation characteristics of railway port stations,so as to provide a theoretical reference for optimizing transportation organization at railway port stations and expanding and transforming railway port stations.

关键词

铁路口岸站/阿拉山口站/作业系统/排队网络/设备数量

Key words

Railway Port Station/Alashankou Port Station/Operation System/Queuing Network/Number of Equipment

分类

交通工程

引用本文复制引用

景菲,李春丽..铁路口岸站作业系统能力研究[J].铁道货运,2024,42(6):60-67,8.

铁道货运

1004-2024

访问量0
|
下载量0
段落导航相关论文