| 注册
首页|期刊导航|南方电网技术|基于多核CPU的风光新能源场站全拓扑实时仿真建模方法

基于多核CPU的风光新能源场站全拓扑实时仿真建模方法

黄立滨 郭临洪 郭天宇 赵艳军 胡斌江 许建中

南方电网技术2024,Vol.18Issue(6):79-88,10.
南方电网技术2024,Vol.18Issue(6):79-88,10.DOI:10.13648/j.cnki.issn1674-0629.2024.06.010

基于多核CPU的风光新能源场站全拓扑实时仿真建模方法

Full-Topology Real-Time Simulation Modeling Method for the Wind Farm and Photovoltaic New Energy Station Based on Multi-Core CPU

黄立滨 1郭临洪 2郭天宇 3赵艳军 4胡斌江 3许建中2

作者信息

  • 1. 直流输电技术全国重点实验室(南方电网科学研究院),广州 510663||中国南方电网有限责任公司,广州 510663
  • 2. 华北电力大学电气与电子工程学院,北京 102206
  • 3. 直流输电技术全国重点实验室(南方电网科学研究院),广州 510663
  • 4. 中国南方电网有限责任公司,广州 510663
  • 折叠

摘要

Abstract

Wind farms and photovoltaic new energy stations are important in constructing new power system,and their electromagnetic transient real-time simulations attract more and more attentions.Due to the complexity of the network solution and the lengthy serial logic for the new energy station,it is difficult to achieve real-time simulation on the currently mature multi-core CPU simulator.A full-topology real-time simulation modeling method for the wind farm and photovoltaic(PV)power station based on multi-core CPU is proposed.Based on the principle of electrical network equivalence,this method establishes a four-terminal equivalent model of power units,and designs a parallel simulation architecture suitable for the multi-core CPU according to the simulation process of this model to realize real-time simulation of new energy stations.The proposed station model uses the calcula-tion for internal voltage to retain high-precision full topological information,and at the same time effectively reduces the network solution resource occupation and shortens the serial logic by reducing the order.After simulation tests,compared with the RTDS model,the model built by this method not only ensures that the accuracy error is less than 4%,but also enables a threefold increase in the scale of the power station that can be simulated in real time,effectively reducing the hardware cost of real-time simulation.

关键词

风光新能源/实时仿真/电磁暂态/仿真模型

Key words

wind farm and photovoltaic new energy/real-time simulation/electromagnetic transient/simulation model

分类

信息技术与安全科学

引用本文复制引用

黄立滨,郭临洪,郭天宇,赵艳军,胡斌江,许建中..基于多核CPU的风光新能源场站全拓扑实时仿真建模方法[J].南方电网技术,2024,18(6):79-88,10.

基金项目

国家自然科学基金资助项目(52277094) (52277094)

中国南方电网有限责任公司科技项目(ZBKJXM20220068). Supported by the National Natural Science Foundation of China(52277094) (ZBKJXM20220068)

the Science and Technology Project of China Southern Power Grid Co.,Ltd.(ZBKJXM20220068). (ZBKJXM20220068)

南方电网技术

OA北大核心CSTPCD

1674-0629

访问量0
|
下载量0
段落导航相关论文