| 注册
首页|期刊导航|天然气与石油|硬地层防斜打快底部钻具组合结构优化研究

硬地层防斜打快底部钻具组合结构优化研究

花谊昌 龙远 王学迎 王越之 荣淮

天然气与石油2024,Vol.42Issue(3):110-116,7.
天然气与石油2024,Vol.42Issue(3):110-116,7.DOI:10.3969/j.issn.1006-5539.2024.03.016

硬地层防斜打快底部钻具组合结构优化研究

Research on structure optimization of anti-deviation fast Bottom Hole Assembly in hard formation

花谊昌 1龙远 2王学迎 1王越之 1荣淮3

作者信息

  • 1. 长江大学石油工程学院,湖北 武汉 430100||油气钻完井技术国家工程研究中心,湖北 武汉 430100||长江大学油气钻采工程湖北省重点实验室,湖北 武汉 430100
  • 2. 中海石油(中国)有限公司海南分公司,海南 海口 570100
  • 3. 中国石油西南油气田分公司川东北气矿,四川 达州 635000
  • 折叠

摘要

Abstract

In Fukang area of Junggar Basin,the deep strata exhibits high rock hardness and large dip angle,rendering traditional pendulum drilling assembly speed-up tool ineffective in preventing deviation and achieving fast drilling.To address this challenge,this paper,based on the analysis of the mechanical drilling rate improvement achieved by employing a torque impactor in hard formations,introduces a novel Bottom Hole Assembly(BHA)configuration that combines a Torque Impactor with a Single Bend Screw.This innovative BHA is designed to maximize the release of drilling pressure and leverage the speed-up capabilities of the torque impactor while effectively controlling deviation in high-angle formations.Based on the equilibrium trend analysis,this study investigates the influence of BHA structural parameters on its anti-deviation capabilities,and identifies key parameters.The field application shows that the newly designed BHA(Bottom Hole Assembly),integrating torque impactor with Single Bend Screw,can effectively realize the purpose of anti-deviation and fast drilling in hard formation,providing valuable insights for drilling operation in deep,hard formation.

关键词

硬地层/单弯双稳/底部钻具组合/直井防斜/扭力冲击器

Key words

Hard formation/Single-bend and double-stabilizer/Bottom hole assembly/Deviation control on vertical wells/Torque impactor

引用本文复制引用

花谊昌,龙远,王学迎,王越之,荣淮..硬地层防斜打快底部钻具组合结构优化研究[J].天然气与石油,2024,42(3):110-116,7.

天然气与石油

OACSTPCD

1006-5539

访问量0
|
下载量0
段落导航相关论文