铁道货运2024,Vol.42Issue(6):6-12,7.DOI:10.16669/j.cnki.issn.1004-2024.2024.06.02
兴保铁路冯家川站新建装车环线方案研究
Schemes of New Loading Loop at Fengjiachuan Station of Xingbao Railway
马孟祺 1刘俊 1奚文媛 1刘志军1
作者信息
- 1. 中铁工程设计咨询集团有限公司 线路站场设计研究院,北京 100055
- 折叠
摘要
Abstract
Xingbao Railway is an important part of the Wari railway collection and distribution system,the energy artery of the national"west to east coal transmission".Fengjiachuan station is the original loading station of Xingbao Railway,and its existing double loading loop has become increasingly unable to meet the needs of station loading capacity.Therefore,while the second line of Xingbao Railway is added,Fengjiachuan station urgently needs to build new loading lines to meet the loading demand for the new cargo volume.Due to the complex terrain and engineering of Fengjiachuan Station,this paper focused on three layout schemes of the loading loop:the new loading loop surrounding the existing one,the new loading loop overpassing Fenghong Railway yard,and the new loading loop built on the opposite side of the existing railway yard.By comparing the three schemes,the third one was considered to have the least impact on the operation of the existing station and loading system.The double track of the Fenghong Railway was reserved to run through the double track of the Xingbao Railway.The elevation of each railway yard was consistent,and the operation was convenient.Besides,there were fewer interferences between the existing and newly built loading loops.Therefore,the scheme of the new loading loop built on the opposite side of the existing railway yard is recommended after research.关键词
重载铁路/兴保铁路/装车环线/车站布置形式/方案比选Key words
Heavy-Haul Railway/Xingbao Railway/Loading Loop/Station Layout/Scheme Comparison and Selection分类
交通工程引用本文复制引用
马孟祺,刘俊,奚文媛,刘志军..兴保铁路冯家川站新建装车环线方案研究[J].铁道货运,2024,42(6):6-12,7.