世界有色金属Issue(10):10-12,3.
刚果(金)绿纱铜钴矿湿法冶金工艺优化
Hydrometallurgical process optimization of the Luishia Cu-Co project,DRC
摘要
Abstract
The Luishia Cu-Co project is located approximately 70km northwest of Lubumbashi City,Haunt Katanga Province,DRC.The Luishia Cu-Co deposit is dominated by sulfide ores with some oxidized ores near the surface.The design adopts the hydrometallurgical process of mixed flotation of both oxidized and sulfide ore,after concentrate fluidized bed roasting,the calcine sent into L-SX-EW to produce cathode copper,and the raffinate neutralization to precipitating cobalt hydroxide.The practice shows that the use of mixed flotation affects the comprehensive recovery of copper and cobalt,and the capacity of the plant cannot be fully used.After the improvements,the oxidized ores leached directly,combined with roasting sulfide concentrate,enters into the hydrometallurgical program.The comprehensive recovery rate of copper was greatly improved,and the copper production capacity increased from 25,000 tpa to 35,000 tpa.关键词
赞比亚-刚果(金)铜矿带/铜钴矿床/氧化矿/硫化矿/湿法冶金/工艺优化Key words
Zambia-D.C.Congo Copper(cobalt)ore belt/oxidized ore/sulfide ore/hydrometallurgy/process optimization分类
冶金工业引用本文复制引用
吴免利,王亚雷,高帮飞..刚果(金)绿纱铜钴矿湿法冶金工艺优化[J].世界有色金属,2024,(10):10-12,3.基金项目
中铁资源集团有限公司科技重大课题(编号2023-重大-01)资助. (编号2023-重大-01)