摘要
Abstract
The purpose of this paper is to solve the problem of tailings mining scheme selection of tailings storage and its mining technology process,in order to promote the effective recovery and reuse of tailings resources.This paper takes a tailing depot as the research object and analyzes the tailing recovery mining scheme in depth.Firstly,four tailings mining schemes are initially proposed by comprehensively considering the mining technical conditions of this tailings depot.Secondly,based on the preliminary results,an in-depth economic and technical comparison of the programs was carried out,and the sand mining ship mining program was identified as the optimal choice.Finally,the mining technology of the sand mining ship mining program was studied,and the stability analysis was carried out based on the internal slope formed by back mining,which verified the feasibility of the program.The research in this paper not only provides practical solutions for tailings mining in tailings ponds,but also provides a useful reference for promoting the sustainable utilization of mineral resources and the green development of the mining industry.关键词
尾矿库/尾矿开采/采砂船/水力开采/边坡稳定性Key words
tailings pond/tailings mining/sand dredging vessel/hydraulic mining/slope stability分类
矿业与冶金