| 注册
首页|期刊导航|市政技术|隧道开挖诱发滑坡与衬砌开裂处治与分析

隧道开挖诱发滑坡与衬砌开裂处治与分析

王新刚 许晓静 王娟娟

市政技术2024,Vol.42Issue(7):22-29,8.
市政技术2024,Vol.42Issue(7):22-29,8.DOI:10.19922/j.1009-7767.2024.07.022

隧道开挖诱发滑坡与衬砌开裂处治与分析

Treatment and Analysis of Landslide and Lining Cracking Induced by Tunnel Excavation

王新刚 1许晓静 2王娟娟2

作者信息

  • 1. 中国铁建昆仑投资集团有限公司,四川成都 610095
  • 2. 西安建筑科技大学土木工程学院,陕西西安 710055||陕西省岩土与地下空间工程重点实验室,陕西西安 710055
  • 折叠

摘要

Abstract

The survey and design of tunnels in mountainous areas usually avoid tunnels crossing large landslides,but the portal section of mountain tunnel inevitably crosses the slope.During tunnel construction,deformation and slid-ing of ancient landslide and slope often occur by tunnel excavation,which cause collapse and lining cracking.Taken Hanshankou tunnel as a project case,the mechanism of slope sliding and lining cracking induced by tunnel con-struction is discussed and the effectiveness of reinforcement measures is evaluated.According to the distribution characteristics of lining cracks and the variation law of width with time,combined with the deformation characteris-tics of the whole lining,two types of lining cracking mechanisms are summarized.The first type is the tension crack in the lining,which corresponds to the formation mechanism of the cracks in the deep buried side arch foot of the tunnel.This kind of crack is in an open state with general larger width.And the width changes obviously with time;The second type is the compression crack in the lining,which corresponds to the formation mechanism of the shal-low side arch shoulder crack of the tunnel.This kind of crack is generally in a closed state with smaller width and smaller change of width with time.

关键词

山区隧道/滑坡/机理/加固措施/衬砌开裂

Key words

mountain tunnel/landslide/mechanism/reinforcement measures/lining cracking

分类

交通运输

引用本文复制引用

王新刚,许晓静,王娟娟..隧道开挖诱发滑坡与衬砌开裂处治与分析[J].市政技术,2024,42(7):22-29,8.

基金项目

陕西省创新能力支撑计划-创新团队(2020TD-005) (2020TD-005)

市政技术

1009-7767

访问量0
|
下载量0
段落导航相关论文