基坑施工出入口通行能力影响因素分析
Analysis of Influencing Factors on the Traffic Capacity of Construction Entrances and Exits of the Foundation Pit
摘要
Abstract
In order to ensure smooth road traffic and construction quality and safety,improve road traffic safety and efficiency,and even improve the overall construction efficiency,the data of the comprehensive transportation hub project of Beijing Municipal Administrative Center Station is taken as an example.The factors affecting the traffic capacity of the entrance and exit of the foundation pit are analyzed from four aspects of road,traffic,control & man-agement and environment.The first level indicators of four influencing factors of road,traffic,control & manage-ment measures and environmental conditions are extended to 16 second level indicators of influencing factors such as the width of the road connecting the entrance and exit.This proposes a new research approach to develop reason-able traffic control measures and improve the safety of the road at entrance and exit of the foundation pits.关键词
施工基坑出入口/通行能力/影响因素/交通安全Key words
construction pit entrance and exit/traffic capacity/influencing factor/traffic safety分类
交通运输引用本文复制引用
郭飞,孙洁,宫帅港,王富强,李西辉,赵亮..基坑施工出入口通行能力影响因素分析[J].市政技术,2024,42(7):30-37,8.基金项目
国家自然科学基金项目(51108011) (51108011)