西北水电Issue(3):48-53,6.DOI:10.3969/j.issn.1006-2610.2024.03.008
1200m特高水头钢岔管制造创新与质量控制
Manufacturing Innovation&Quality Control of Steel Bifurcated Pipe under 1200m Extra High Head
朱树清 1胡铠 2易克新3
作者信息
- 1. 长江三峡技术经济发展有限公司,北京 101199
- 2. 中国长江电力股份有限公司,北京 100032
- 3. 三峡物资招标管理有限公司,成都 610042
- 折叠
摘要
Abstract
To ensure the manufacturing quality and construction period of the steel bifurcation pipe under 1200 m extra-high head,the build-ers of the Changlongshan Pumped Storage Power Station have carried out a series of innovation and control measures.Through investigating and determining the overall manufacturing and transportation plan of the steel bifurcation pipe to the construction site in advance and control-ling the processes of steel plate cutting,marking,rolling,assembly and welding,the external dimensions and internal quality of the steel bi-furcated pipe are guaranteed.The water pressure test results show that on the basis of the first successful water pressure test,the pressure value of the second test is increased to further reduce the residual stress of the welded steel bifurcation pipe,setting a record of 10 MPa for the water pressure test of steel bifurcation pipe in China.It can provide reference for similar projects.关键词
特高水头/钢岔管/制造/创新/质量控制Key words
ultra-high water head/steel bifurcated pipe/manufacturing/innovation/QC分类
建筑与水利引用本文复制引用
朱树清,胡铠,易克新..1200m特高水头钢岔管制造创新与质量控制[J].西北水电,2024,(3):48-53,6.