| 注册
首页|期刊导航|西北水电|泄洪洞挑流鼻坎体型优化及下游冲刷试验

泄洪洞挑流鼻坎体型优化及下游冲刷试验

史蝶 贺翠玲 刘少斌 李鹏峰 荆海晓

西北水电Issue(3):61-66,88,7.
西北水电Issue(3):61-66,88,7.DOI:10.3969/j.issn.1006-2610.2024.03.010

泄洪洞挑流鼻坎体型优化及下游冲刷试验

Optimization of Spillway Tunnel Bucket and River Erosion Experiment

史蝶 1贺翠玲 2刘少斌 3李鹏峰 4荆海晓5

作者信息

  • 1. 中国电建集团西北勘测设计研究院有限公司,西安 710065
  • 2. 中国电建集团西北勘测设计研究院有限公司,西安 710065||陕西省水生态环境工程技术研究中心,西安 710065
  • 3. 中国电建集团西北勘测设计研究院有限公司,西安 710065||陕西省河湖生态保护与修复"四主体一联合"工程技术研究中心,西安 710065
  • 4. 中国电建集团西北勘测设计研究院有限公司,西安 710065||国家能源水电工程技术研发中心高边坡与地质灾害研究治理分中心,西安 710065
  • 5. 西安理工大学 西北旱区生态水利国家重点实验室,西安 710048
  • 折叠

摘要

Abstract

The spillway of a hydropower station intersects diagonally with the downstream river channel,and the distance between the flip bucket and the right bank slope of the river channel is relatively close.Using a conventional forward flip bucket will generate small flow drop,and large flow will impact the bank,endangering the foundation of the flip bucket and the stability of the right bank slope.Based on this,this study establishes a hydraulic model with a scale of 1:35 to study a new type of flip bucket structure suitable for the oblique intersection of flood discharge cavities and river channels,and the layout of flood discharge outlets near the right bank slope.The experimental results show that the inclined nose bucket has a better effect on solving the serious problem of scouring on the right bank slope.Whether it is in the case of frequent floods or low frequency floods,the right arc wall of the inclined nose bucket flips the water flow and guides it towards the middle of the riverbed,vertically stretching it significantly.The water tongue landing point is far away from the right bank slope,which is beneficial for energy dissipation and erosion prevention in downstream rivers.This study has reference significance for the selection of nose shaped ridges with similar terrains in actual hydraulic projects.

关键词

消能防冲/挑流鼻坎/模型试验/舌形鼻坎/斜鼻坎

Key words

dissipation and anti-erosion/flip bucket/model experimentation/tongue-shaped spillway bucket/inclined spillway bucket

分类

建筑与水利

引用本文复制引用

史蝶,贺翠玲,刘少斌,李鹏峰,荆海晓..泄洪洞挑流鼻坎体型优化及下游冲刷试验[J].西北水电,2024,(3):61-66,88,7.

基金项目

国家自然科学基金项目(51909211) (51909211)

陕西省自然科学基础研究计划(2019JQ-744) (2019JQ-744)

西安市科技计划项目(23GXFW0050). (23GXFW0050)

西北水电

1006-2610

访问量0
|
下载量0
段落导航相关论文