The inlet lock chamber structure of a large hydropower station diversion tunnel is a typical three-dimensional stress structure.The maximum water head acting on the gate during the sealing period reaches 120m,with a high hydraulic thrust.In order to ensure the safety and reliability of the intake lock chamber structure of the diversion tunnel under complex stress conditions,this paper establishes an overall finite element model of lock chamber.And referring to similar engineering calculations,it conducts three-dimensional calculation analysis on the inlet lock chamber structure of the diversion tunnel under three working conditions:completion period,operation period,and sealing period.关键词
进口闸室/三维有限元/应力分析/大型水电站Key words
inlet lock chamber/three-dimensional finite element analysis/stress analysis/large hydropower station分类
建筑与水利引用本文复制引用