| 注册
首页|期刊导航|云南水力发电|藏区某水工隧洞涌泥成因分析及处理方案

藏区某水工隧洞涌泥成因分析及处理方案

焦艳彬 王照英 陈建安 李鹏飞 张立威 刘广

云南水力发电2024,Vol.40Issue(7):110-113,4.
云南水力发电2024,Vol.40Issue(7):110-113,4.DOI:10.3969/j.issn.1006-3951.2024.07.027

藏区某水工隧洞涌泥成因分析及处理方案

Cause Analysis and Treatment Scheme of Mud Gushing in a Hydraulic Tunnel in Xizang

焦艳彬 1王照英 2陈建安 2李鹏飞 1张立威 1刘广1

作者信息

  • 1. 中国电建集团贵阳勘测设计研究院有限公司,贵州 贵阳 550081
  • 2. 华能澜沧江水电股份有限公司,云南 昆明 650000
  • 折叠

摘要

Abstract

The mudslide disaster that occurs when a hydraulic tunnel passes through a sandstone and mudstone formation seriously restricts the progress of the project and threatens construction safety.Taking a hydraulic tunnel in Xizang as an example,the causes of mud influx in the tunnel were accurately identified through the use of geophysical exploration and geological drilling methods.It adopts a treatment plan of backfilling with stone slag and reverse pressure grouting inside the tunnel,advanced support for large pipe sheds,advanced support for small conduits,steel arches,and short advance excavation support with reserved core soil method,which has successfully passed the construction of unfavorable geological tunnel section.

关键词

水工隧洞/涌泥/不良地质洞段/处理方案

Key words

hydraulic tunnel/mud gushing/unfavorable geological tunnel section/treatment scheme

分类

建筑与水利

引用本文复制引用

焦艳彬,王照英,陈建安,李鹏飞,张立威,刘广..藏区某水工隧洞涌泥成因分析及处理方案[J].云南水力发电,2024,40(7):110-113,4.

基金项目

电建集团科研资助项目(DJ-ZDXM-2020-50) (DJ-ZDXM-2020-50)

云南水力发电

1006-3951

访问量0
|
下载量0
段落导航相关论文