云南水力发电2024,Vol.40Issue(7):110-113,4.DOI:10.3969/j.issn.1006-3951.2024.07.027
藏区某水工隧洞涌泥成因分析及处理方案
Cause Analysis and Treatment Scheme of Mud Gushing in a Hydraulic Tunnel in Xizang
摘要
Abstract
The mudslide disaster that occurs when a hydraulic tunnel passes through a sandstone and mudstone formation seriously restricts the progress of the project and threatens construction safety.Taking a hydraulic tunnel in Xizang as an example,the causes of mud influx in the tunnel were accurately identified through the use of geophysical exploration and geological drilling methods.It adopts a treatment plan of backfilling with stone slag and reverse pressure grouting inside the tunnel,advanced support for large pipe sheds,advanced support for small conduits,steel arches,and short advance excavation support with reserved core soil method,which has successfully passed the construction of unfavorable geological tunnel section.关键词
水工隧洞/涌泥/不良地质洞段/处理方案Key words
hydraulic tunnel/mud gushing/unfavorable geological tunnel section/treatment scheme分类
建筑与水利引用本文复制引用
焦艳彬,王照英,陈建安,李鹏飞,张立威,刘广..藏区某水工隧洞涌泥成因分析及处理方案[J].云南水力发电,2024,40(7):110-113,4.基金项目
电建集团科研资助项目(DJ-ZDXM-2020-50) (DJ-ZDXM-2020-50)