北京水务Issue(3):5-11,7.DOI:10.19671/j.1673-4637.2024.03.002
北京市北运河流域"23·7"洪水调度分析
Analysis of"23·7"flood dispatch in the North Canal basin of Beijing
王云海 1杨东明 1周妍 2周星 3范勤鹏 1关得天1
作者信息
- 1. 北京市北运河管理处 北京 101100
- 2. 北京泽通水务建设有限公司 北京 101100
- 3. 北京市水科学技术研究院 北京 100048
- 折叠
摘要
Abstract
From July 29 to August 2 of year 2023,the Haihe River basin experienced the"23·7"regional flood due to the impact of Typhoon"Du Suri",which led to the occurrence of flood in the North Canal of Beijing.This flood was a rare event in the past decade.This paper focused on the application and opera-tion of the"Tongzhou Weir"engineering system,which employd the principles of"upper storage,middle drainage,lower drainage,and effective stormwater storage"along the North Canal.Based on the analysis of the data from rainstorm,water quantity,water engineering,and water dispatching,this study aimed to un-derstand the characteristics of the flood event and compare them with historical flood patterns.The re-search analyzes and assess the effectiveness of project dispatching measures and flood response under the current flood control framework in this basin.These findings can serve as a valuable reference for future construction and enhancement of related engineering systems.关键词
北运河/通州堰/"23·7"洪水/防洪工程/防洪调度Key words
The North Canal/Tongzhou Weir/"23·7"flood/flood control engineering/flood dispatch分类
建筑与水利引用本文复制引用
王云海,杨东明,周妍,周星,范勤鹏,关得天..北京市北运河流域"23·7"洪水调度分析[J].北京水务,2024,(3):5-11,7.