城市建筑2024,Vol.21Issue(14):205-208,232,5.DOI:10.19892/j.cnki.csjz.2024.14.49
大直径盾构隧道工程施工风险分析及施工措施
Analysis on Construction Risks of Large Diameter Shield Tunnel Project and Its Construction Measures
李祥钰 1郭靖 1赵越 1孙小力 1王亦嘉1
作者信息
摘要
Abstract
Nowadays,our country is in a rapid development period of urban construction.With the rapid development of the real estate industry,the construction of the urban infrastructure is increasing rapidly,especially the demand for related facilities of the subway tunnel.In recent years,the engineering technology of shield tunnel at home and abroad is developing towards the direction of large depth,large section and long distance.Due to the characteristics of large diameter shield tunnel engineering,such as large section and complex geological conditions,its construction technical requirements and difficulties are greatly improved.According to the current construction status of large diameter shield tunnel in our country,the paper analyzes and discusses its construction technology,summarizes the important and difficult points in the construction process of large diameter shield tunnel,and then proposes corresponding construction measures to promote the development of related fields of large diameter shield tunnel,and to provide a reference for similar projects.关键词
大直径盾构隧道/重难点/施工措施Key words
large diameter shield tunnel/important and difficult points/construction measures分类
建筑与水利引用本文复制引用
李祥钰,郭靖,赵越,孙小力,王亦嘉..大直径盾构隧道工程施工风险分析及施工措施[J].城市建筑,2024,21(14):205-208,232,5.