东北水利水电2024,Vol.42Issue(7):1-3,6,4.
大顶子山航电枢纽消力池冲坑处理方案研究
Research on scouring pit treatment scheme of stilling pool in Dadingzishan Navigation-power Hub
李朋飞 1侯禹君 1周荣磊1
作者信息
- 1. 中水东北勘测设计研究有限责任公司,吉林长春 130021
- 折叠
摘要
Abstract
Since the completion and operation of Dadingzishan Navigation-power Hub,there has been a deep scouring pit behind the right bank stilling pool.This paper refers to the domestic experience of similar projects,the causes and effects of the pit are analyzed,and through the analysis and demonstration of the comparative treatment scheme,the treatment scheme of underwater non-dispersive concrete+riprap+reinforced gabion is finally determined,and the specific process of the design scheme is explained and the model test is demonstrated.At present,the project has been implemented and achieved good results,which can provide reference for other similar projects.关键词
消力池冲坑/水下不分散混凝土/钢筋石笼/模型试验Key words
stilling pool scouring pit/underwater non-dispersive concrete/reinforced gabion/model test分类
水利科学引用本文复制引用
李朋飞,侯禹君,周荣磊..大顶子山航电枢纽消力池冲坑处理方案研究[J].东北水利水电,2024,42(7):1-3,6,4.