摘要
Abstract
With the rapid development of the Chinese economy,a large amount of infrastructure is being constructed,and there are more and more intersecting buildings,which often require protection from each other.A certain aqueduct needs protection due to the exposed pier caused by the renovation and expansion of the water gate.When selecting protection schemes,a comprehensive comparison was made from the aspects of the outer contour of the plane and the structural scheme.Three types of out of plane contours were proposed,including square,diamond,and"eye shaped"contours.A hydraulic model was used for experimental research to select the"eye shaped"out of plane contour with better water flow patterns.The structural scheme has been comprehensively compared and selected from the perspectives of site construction conditions and suitable sites for various schemes,and the micro pile scheme has feasibility.The successful implementation of the protection of the aqueduct pier not only ensures the construction of the water gate,but also ensures the safe operation of the aqueduct,playing a huge role and achieving good results,which can be used as a reference for similar projects.关键词
微型桩/渡槽/槽墩Key words
micro-pile/aqueduct/pier分类
建筑与水利