煤炭与化工2024,Vol.47Issue(6):32-35,39,5.DOI:10.19286/j.cnki.cci.2024.06.007
大巷高位爆破切顶控制综采工作面采动压力方案研究
Study on mining pressure scheme of high-level blasting roof cutting control fully mechanized mining face in main roadway
王文明 1黄林2
作者信息
- 1. 山西潞阳煤炭投资经营管理有限公司,山西晋中 030800
- 2. 山西寿阳潞阳长榆河煤业有限公司,山西晋中 030000
- 折叠
摘要
Abstract
In Shanxi Changyuhe Coal Industry,when mining No.15 coal seam,the mining dynamic pressure and the strata movement in the goaf have great pressure on the east wing belt roadway and the east wing auxiliary transportation roadway,and there are roof subsidence,floor heave,two sides convergence,I-shaped steel shed deformation and other phenomena.In view of this problem,in order to ensure the safe and smooth mining of the 15108 working face in the eastern mining area of the mine,it was decided to carry out the roof cutting and pressure relief project.Through analysis and research,it was decided to carry out ultra-deep hole high-level roof cutting blasting in the East Wing Auxiliary Transportation Lane,and the key layers,blasting borehole layout and parameters were studied and designed.The practice shows that the designed roof cutting blasting scheme has a good implementation effect,the mining dynamic pressure of the working face is effectively blocked,and there is almost no pressure appearance during the mining period.关键词
压力显现/切顶卸压/超深孔/高位爆破Key words
pressure appearance/roof cutting pressure relief/ultra-deep hole/high blasting分类
矿业与冶金引用本文复制引用
王文明,黄林..大巷高位爆破切顶控制综采工作面采动压力方案研究[J].煤炭与化工,2024,47(6):32-35,39,5.