江西建材Issue(5):228-230,3.
临湖高地下水位区基坑灌注桩及旋喷桩复合止水帷幕施工技术分析
Construction Technology of Composite Water-stop Curtain of Cast-in-place Piles and Jetted Piles in Foundation Pits in the High Groundwater Level Area Near the Reservoir
黄旭生 1潘锡中 1马丽伟 1刘柱1
作者信息
- 1. 深圳市政集团有限公司,广东 深圳 518034
- 折叠
摘要
Abstract
In order to solve the problem of foundation pit construction in the high groundwater level area near the lake,this paper takes the ex-pansion and renovation project of Shenzhen East Lake Water plant as an example,and puts forward a construction technology of the composite water curtain of cast-in-place pile and rotary jet pile.This technology uses the high stiffness of the cast-in-place pile and the water insulation effect of the rotary jet pile to achieve the stability of the foundation pit,seepage prevention and flexibility of the plane layout,shorten the con-struction period,reduce the impact on the surrounding environment,improve the working space of the site and the foundation pit,and ensure the construction safety.关键词
灌注桩/旋喷桩/复合止水帷幕/临湖高地下水位区/稳定性Key words
Cast-in-place pile/Jetted pile/Composite water-stop curtain/High groundwater level area near the reservoir/Stability分类
建筑与水利引用本文复制引用
黄旭生,潘锡中,马丽伟,刘柱..临湖高地下水位区基坑灌注桩及旋喷桩复合止水帷幕施工技术分析[J].江西建材,2024,(5):228-230,3.