| 注册
首页|期刊导航|泥沙研究|黄河下游河道平滩流量变化及其与汛期水沙条件的关系

黄河下游河道平滩流量变化及其与汛期水沙条件的关系

韩小军 卢书慧 史红玲 林树峰

泥沙研究2024,Vol.49Issue(3):69-73,5.
泥沙研究2024,Vol.49Issue(3):69-73,5.DOI:10.16239/j.cnki.0468-155x.2024.03.010

黄河下游河道平滩流量变化及其与汛期水沙条件的关系

Variation of bankfull discharge and its relationship with flow and sediment conditions during flood season in the Lower Yellow River

韩小军 1卢书慧 2史红玲 3林树峰1

作者信息

  • 1. 滨州市引黄灌溉服务中心,山东滨州 256600
  • 2. 山东黄河河务局黄河河口管理局,山东东营 257091
  • 3. 中国水利水电科学研究院,北京 100048
  • 折叠

摘要

Abstract

Based on measured data,the variation of bank-full discharge and its relationship with flow and sediment conditions during flood season in the Lower Yellow River was analyzed.The result shows that the variation trend of bank-full discharge in the Lower Yellow River is first decreasing from 7 000~9 000 m3/s in the mid-20th century to 2 000~4 000 m3/s in the late 20th century,and then increasing to 4 000~7 000 m3/s in the 21s1 century.The established relationship between bankfull discharge at Sunkou and flow and sediment conditions during flood season at Huayuankou shows the bankfull discharge increases with the increase of runoff and the decrease of the sediment coefficient during flood season.However,there is an obvious difference in the relationships between bank-full discharge of Sunkou and flow and sediment conditions during flood season at Huayuankou before and after 2000,which means that the use of water storage and sediment control in Xiaolangdi reservoir has changed the evolution mechanism in the Lower Yellow River.

关键词

黄河下游/平滩流量/水沙条件/河道演变/回归分析

Key words

Lower Yellow River/bankfull discharge/flow and sediment conditions/channel evolution/regres-sion analysis

分类

建筑与水利

引用本文复制引用

韩小军,卢书慧,史红玲,林树峰..黄河下游河道平滩流量变化及其与汛期水沙条件的关系[J].泥沙研究,2024,49(3):69-73,5.

基金项目

国家自然科学基金项目(U22A20237) (U22A20237)

泥沙研究

OA北大核心CSTPCD

0468-155X

访问量0
|
下载量0
段落导航相关论文