科技创新与应用2024,Vol.14Issue(21):152-155,4.DOI:10.19981/j.CN23-1581/G3.2024.21.036
斜坡地形超大型架空叠合式水厂施工组织管理措施
摘要
Abstract
Because of the particularity of its structure,the overhead superimposed waterworks is built on the overhead platform of the slope,which has the advantages of difficult construction,many working procedures and high pressure on the construction period.Therefore,the corresponding construction plan should be made according to the structural characteristics of the project.In the construction quality management,we should adopt a three-pronged approach from three aspects:the quality control in the production process,the technical management in the construction process and the quality monitoring after construction.The management of construction progress is realized in three aspects:organization guarantee,construction management and process control.This paper summarizes the construction organization and management measures of super-large-scale overhead superimposed waterworks on slope topography,which is of reference significance for similar projects.关键词
架空叠合式水厂/施工组织/施工管理/工期进度/质量管理Key words
overhead superimposed waterworks/construction organization/construction management/construction schedule/quality management分类
建筑与水利引用本文复制引用
王勇,易雨锋,白林刚,夏真德..斜坡地形超大型架空叠合式水厂施工组织管理措施[J].科技创新与应用,2024,14(21):152-155,4.基金项目
国家自然科学基金资助项目(52378425) (52378425)
中国施工企业管理协会科技项目(2023-C-112) (2023-C-112)