煤柱群回采沿空掘巷护巷煤柱尺寸研究

王远东 徐大龙 顾伟

山东煤炭科技2024,Vol.42Issue(7):17-22,28,7.
山东煤炭科技2024,Vol.42Issue(7):17-22,28,7.DOI:10.3969/j.issn.1005-2801.2024.07.004

煤柱群回采沿空掘巷护巷煤柱尺寸研究

Research on the Size of Entry Protection Coal-pillar in Goaf Driven Roadway During Coal Pillar Group Mining

王远东 1徐大龙 2顾伟2

作者信息

  • 1. 山西晋煤集团泽州天安海天煤业有限公司,山西 泽州 048012||中国矿业大学煤炭资源与安全开采国家重点实验室,江苏 徐州 221116
  • 2. 中国矿业大学煤炭资源与安全开采国家重点实验室,江苏 徐州 221116
  • 折叠

摘要

Abstract

Taking the coal pillar recovery working face in the fifth panel of Zhaozhuang Coal Mine as the research background,the theoretical calculation showed that the reserved size of coal pillars along the goaf should not be less than 4.1 m.Numerical simulation is used to analyze the surrounding rock stress and plastic zone of coal pillars with different widths during excavation and mining.The numerical simulation scheme designed a total of 8 reserved coal pillar sizes,including 4 m,5 m,6 m,17 m,18 m,19 m,20 m,and 25 m.Finally,the optimal reasonable size of coal pillars is determined to be 19 m.The on-site mine pressure monitoring results show that after leaving a 19 m wide coal pillar for roadway protection and providing reasonable support,the stability of the surrounding rock of the goaf roadway can be improved,which can meet the safety production requirements of the working face and achieve safe and efficient recovery of residual coal pillars in the five panel area.

关键词

残余煤柱群/煤柱尺寸/沿空掘巷/应力演化/矿压监测

Key words

residual coal pillar group/coal pillar size/roadway excavation along goaf/stress evolution/mine pressure monitoring